|
|
| |
| USP |
|
 |
Ultrasonic Scale Preventer |
|
|
|

|

|
Click to enlarge image
|
Basic Principle of USP
- Principle of Vibration
If ultrasound is put into the metal composing facilities, exceedingly small vibration is generated and transferred to the whole facility through the metal.
- Principle of Cavitation
When ultrasound is transferred inside a facility through the metal, numerous bubbles are created and disappeared in the liquid in the facility, which is repeated. At that time, gas is absorbed and exploded in the liquid.
- Principle of the Increase of the Surface
If a particle in a liquid is shattered by ultrasonic waves, surface area enlarges. And the enlarged surface area is bonded other particles, and then it is shattered. During this process, the particle is shattered minutely.
- Principle of Waves
When ultrasonic waves are transferred to a liquid through a metal, a wave motion generates between the surface of the liquid and surface of the metal, so that it prevents that particles and gases are bonded at the surface of the facility, and the transmission of the heat becomes good.
- Principle of the Elimination of Scales
There are fine cracks of existing scales, and bubbles infiltrates in the cracks and are exploded. When it is repeated, the crack gets bigger. Finally the existing scales are dropped off as lump shape.
Features
- Energy Saving
- Preventing Environmental pollution
- Expanding the life span of facility
- Convenience for management
- Semi-permanent life span
- Reducing the cost for consolidation of products
Usage
- To remove and prevent scales & slime in steam boiler, hot water boiler, heat exchanger, condenser, piping, etc.
- To hold the use of chemicals and make it easy during cleaning the inside of facilities
- To remove and prevent scales & deposits in oil refining facility, chemical plant, piping, etc.
Model & Application
|
|
|
Boiler(for heating room), heat exchanger, etc. under 1T/H capacity
|
|
Boiler(for industrial), heat exchanger, etc. under 1T/H capacity
|
|
Boiler(for heating room), heat exchanger,etc., between 1.5 and 3.5T/H capacity
|
|
Boiler(for industrial), heat exchanger, etc. between 1.5 and 3.5T/H capacity
|
|
Boiler(for heating room), heat exchanger, etc., between 4 and 7 T/H capacity
|
|
Boiler(for industrial), heat exchanger, etc. between 4 and 7 T/H capacity
|
|
Boiler(for heating room), heat exchanger, etc. between 8 and 15 T/H capacity
|
|
Boiler(for industrial), heat exchanger, etc. between 8 and 15 T/H capacity
|
|
Boiler, heat exchanger, etc. between 16 and 25 T/H capacity
|
|
Boiler, heat exchanger, etc. between 26 and 35 T/H capacity
|
|
Boiler, heat exchanger, etc. between 36 and 45 T/H capacity
|
|
Heat exchanger in hazard area(it is necessary to examine the application)
|
|
Heat exchanger in hazard area(it is necessary to examine the application)
|
|
Heat exchanger in hazard area(it is necessary to examine the application)
|
|
Heat exchanger in hazard area(it is necessary to examine the application)
|
- For applying boilers and heat exchangers, the model should be upwardly changed as per the quality of water.
- The above boiler for application is listed by that total evaporating remnants is 100ppm.
|
Specification
|
|
|
|
|
|
|
|
|
|
|
50/60 (controlled for application)
|
|
220/230 (controlled for application)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
welding part : Dia. 35mm, cover size : Dia. 58mm designed for application
|
|
|
|
Temperature for application
|
|
|
|
|
|
| |
|
|
|